Khuoi Un village road
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2600044972-00
Notice type
Real announcement
Project name
Khuoi Un village road
Project objective
Investing in the construction of Khuoi Un Village Road to complete rural transport infrastructure, creating a synchronous connection between residential areas, production areas with commune centers and the existing transport network.
Ensuring smooth and safe traffic all year round; Meet the people's needs for travel, study, medical examination and treatment, and cultural exchange; Create favorable conditions for transporting production materials, agricultural products, forest products and goods, contributing to reducing transportation costs, improving production efficiency and increasing income
Project approval ID
189/QĐ-TTDVTH
Project approval date
29/06/2026
Approval authority
Trung tâm dịch vụ tổng hợp xã Nghiên Loan
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
1.QDPD dự toán bước CB ĐT (NQD).signed.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet