Line and TBA 110kV Dong Coi, Nam Dinh province

Watching          
Found: 16:30 09/05/2025
Project number
PR2500027615-00
Notice type
Real announcement
Project name
Line and TBA 110kV Dong Coi, Nam Dinh province
Project objective
- Ensuring electricity supply for Dong Coi Industrial Park Lovers and living and production loads in Nam Truc district; - Enhancing grid links, reducing radius of power supply and creating flexible medium voltage circuits between 110kV stations; improve reliability, reduce losses and improve electricity quality for loads in Nam Truc district and surrounding areas, Nam Dinh province
Investor ID
vnz000009710
Authority
General Director - Northern Power Corporation
Project duration
2 Year
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Huyện Nam Trực, Ninh Binh
Investment Total Value
To view full information please Login or Register
Project approval ID
843/QĐ-EVNNPC
Project approval date
26/04/2025
Approval authority
Tổng công ty Điện lực miền Bắc
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
Plan for selecting contractors to measure and measure and make land for projects: - Export of 110kV after 220kV Hau Loc TBA, Thanh Hoa Province; - Line and TBA 110kV Yen Dinh 3, Thanh Hoa Province; - Line and TBA 110kV Tinh Gia 3, Thanh Hoa Province; - Line and TBA 110kV Quan Hoa, Thanh Hoa Province; - Line and TBA 110kV spring, Thanh Hoa province; - Line and TBA 110kV Van Ho, Son La province; - 110kV Gia Thinh and branch transformer station, Ninh Binh province; - Line and TBA 110kV Ky Son, Nghe An Province; - Ba Sao Line and TBA 110kV, Ha Nam province; - Line and TBA 110kV Yen Thanh, Nam Dinh province; - Line and TBA 110kV My Thuan Industrial Park, Nam Dinh Province; - Line and TBA 110kV Dong Coi, Nam Dinh province; - Export of 110kV after 220kV Ly Nhan TBA, Ha Nam province; - Improving the 110kV Hai Hau - Nghia Hung line, Nam Dinh province.
7.166.319.471 VND
2
2.197.546.009 VND
3
4.355.434.105 VND
Total amount
13.719.299.585 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 3 0 9 10 2 12.04 11
You did not use the site, Click here to remain logged. Timeout: 60 second