moving medium- and low-voltage power lines for site clearance for project construction: Roads from Bim Son Industrial Park to coastal roads in Nga Son - Hoang Hoa section

Watching          
Project Overall procurement plan Contractor selection plan Tender Notice Bid opening result Contractor selection result
Found: 10:28 13/01/2022
Project ID
20220125998-00
Notice type
Real announcement
Project name
moving medium- and low-voltage power lines for site clearance for project construction: Roads from Bim Son Industrial Park to coastal roads in Nga Son - Hoang Hoa section
Project Category
Group C
Using ODA
No
Investment Total Value
To view full information please Login or Register
Project approval ID
3888/QĐ-UBND
Approval date
14/12/2021
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
2.002.819.223
Total amount
2.002.819.223

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 0 0 0 0 5 0.00 0
You did not use the site, Click here to remain logged. Timeout: 60 second