New construction connecting medium voltage lines to ensure electricity supply in Tan Thoi Nhi, Ba Diem, Xuan Thoi Dong communes, Hoc Mon district
Project objective
The project "New construction connecting medium voltage lines to ensure electricity supply in the area of Tan Thoi Nhi, Ba Diem, Xuan Thoi Dong communes, Hoc Mon district" is implemented with items to pull new medium voltage grids connecting the lines. neutral; Pull new double-circuit underground cables instead of branches that are operating as a single circuit. A summary of the contents is as follows:
- Replace low-voltage poles, replace medium-voltage wires with small cross-sections, long-term operation, low sags that do not ensure safety, create loop connections for branch branches, increase load transfer capacity
Project management Type
The investor directly manages the project
Implementation location
Huyện Hóc Môn, TP.Hồ Chí Minh
Project approval ID
2479/EVNHCM-KH
Project approval date
08/07/2024
Approval authority
Tổng công ty Điện lực TP.HCM
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Giao thuc hien cac DA dau tu xay dung 072024.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans for this project
| NO |
Contractor selection plan ID |
Contractor selection plan name |
Total investment |
|
1
|
|
479.219.927 VND |
Total amount |
479.219.927 VND |
Statistical table of bidding packages under the project
| Statistics by type of bidding package |
Statistics by form |
Online bidding value (billion VND) |
Number of bidding packages whose results have been posted |
| Goods |
Civil Works |
Consulting |
Other categories |
Non-Consulting |
Online |
Offline |
| 0 |
0 |
1 |
0 |
0 |
1
|
0 |
0.48
|
1
|