Purchase periodic replacement materials for evaporators at Hoa Phu Pumping Station and Tan Hiep Water Plant in 2024-2025

Watching      
Project Overall procurement plan Contractor selection plan Contractor selection result
Found: 09:34 25/04/2024
Project number
PR2400018384-00
Notice type
Real announcement
Project name
Purchase periodic replacement materials for evaporators at Hoa Phu Pumping Station and Tan Hiep Water Plant in 2024-2025
Project objective
Equipping these accessories is necessary to maintain stable device operation. Ensuring safe, effective, continuous and stable water supply at Tan Hiep Water Plant.
Investor ID
vn0301129367
Authority
General Director of Saigon Water Supply Corporation - One member limited liability
Project duration
9 Month
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
593/QĐ-TCT-NMNTH
Project approval date
19/04/2024
Approval authority
TỔNG CÔNG TY CẤP NƯỚC SÀI GÒN - TRÁCH NHIỆM HỮU HẠN MỘT THÀNH VIÊN
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

QĐ593_19.04.2024.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
199.100.000 VND
Total amount
199.100.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
1 0 0 0 0 0 1 0.00 1
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8356 Projects are waiting for contractors
  • 1158 Tender notices posted in the last 24 hours
  • 1866 Contractor selection plan posted in the last 24 hours
  • 24376 Tender notices posted in the past month
  • 38630 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second