Quang Binh Provincial Sports Center

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: Ban Quản lý Dự án đầu tư xây dựng công trình dân dụng và công nghiệp tỉnh Quảng Bình
 ⚬ Old system: Sở Văn hóa và Thể thao Quảng Bình
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Sở Văn hóa và Thể thao tỉnh Quảng Bình:
 ⚬ The plan to select the contractor for the project of Quang Binh province's fitness center

- The following bidding packages have the investor Sở Văn hóa và Thể thao tỉnh Quảng Bình:
 ⚬ Quality inspection of technical infrastructure and civil works

 ⚬ Construction of civil items (including civil construction costs and contingency costs)

 ⚬ Construction supervision consultancy for civil works and equipment installation

 ⚬ Construction drawing design (project adjustment)

 ⚬ Verify construction drawing designs and estimates (project adjustments)

 ⚬ Device

 ⚬ Construction of generator house, garden, outdoor lighting, sound absorption on auditorium walls (including construction costs and contingency costs)

 ⚬ XL4: Construction of sports field surface

- The following bidding packages have the investor Ban Quản lý Dự án đầu tư xây dựng công trình dân dụng và công nghiệp tỉnh Quảng Bình:
 ⚬ Construction of technical infrastructure items (including technical infrastructure construction costs and contingency costs)

 ⚬ Construction supervision consultancy for HTKT . items
Click để xem đầy đủClick để thu gọn
Found: 10:09 21/04/2022
Project number
20220451877-00
Notice type
Real announcement
Project name
Quang Binh Provincial Sports Center
Investor ID
vn3101039471
Project Category
Group B
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register
Project approval ID
4364/QĐ-UBND
Project approval date
25/12/2021
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
240.000.000.000 VND
Total amount
240.000.000.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
1 4 13 0 0 8 10 215.61 10
You did not use the site, Click here to remain logged. Timeout: 60 second