Regularly clear and repair traffic to ensure traffic on roads managed by the district University from University 31 to University 39 and urban roads

Watching          
Found: 14:32 10/09/2024
Project number
PR2400050682-00
Notice type
Real announcement
Project name
Regularly clear and repair traffic to ensure traffic on roads managed by the district University from University 31 to University 39 and urban roads
Project objective
DH.32 and DH.33 routes were built a long time ago. Every year, trees along both sides of the road obscure visibility but have not yet been cleared. The road surface in many sections has sunk deeply, causing traffic insecurity, because Therefore, it is necessary to clear and fix degraded roads, potholes... to ensure traffic safety and serve the people to travel conveniently.
Investor ID
vn4400358728
Authority
Department of Economy and Infrastructure of Tuy An district
Project duration
4 Month
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Huyện Tuy An, Phu Yen province
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
49/QĐ-KTHT
Project approval date
05/09/2024
Approval authority
Phòng Kinh tế và Hạ tầng huyện Tuy An
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

QĐ 49 PHE DUYET TK BVTC-DT DH.31 den DH.39.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
392.162.507 VND
Total amount
392.162.507 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 1 3 0 0 1 3 0.34 1
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8256 Projects are waiting for contractors
  • 1093 Tender notices posted in the last 24 hours
  • 1746 Contractor selection plan posted in the last 24 hours
  • 24308 Tender notices posted in the past month
  • 38508 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second