Renovate and resolve overloaded power grid in Chau Thanh Electricity area

Found: 11:09 26/09/2024
Project number
PR2400054785-00
Notice type
Real announcement
Project name
Renovate and resolve overloaded power grid in Chau Thanh Electricity area
Project objective
Currently, the proportion of single-phase medium and low voltage power grid belonging to Tien Giang Power Company's assets is quite large, causing many disadvantages in management and operation; Specifically, by August 2024, the single-phase medium-voltage grid accounts for 53.5% of the total length of the medium-voltage grid, and the single-phase low-voltage grid accounts for 91.5% of the total length of the low-voltage grid. Investment in projects to gradually upgrade the 1-phase medium-low voltage power grid to 3-phase; prevent the risk of full load and overload of the power grid; Solve pressure drop, reduce power loss.
Investor ID
vnz000012993
Authority
Le Huu Duc
Project duration
2 Year
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Huyện Châu Thành, Tien Giang province
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
1718/QĐ-PCTG
Project approval date
14/08/2024
Approval authority
Công ty Điện lực Tiền Giang
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

1718_QD Phe duyet lai PADT nam 2025 cua Dien luc Chau Thanh.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Overall contractor selection plans for this project

NO Overall contractor selection plan ID Overall contractor selection plan name
1

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
46.000.000.000 VND
Total amount
46.000.000.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 3 0 0 0 3 0.00 3
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8536 Projects are waiting for contractors
  • 1058 Tender notices posted in the last 24 hours
  • 1920 Contractor selection plan posted in the last 24 hours
  • 25293 Tender notices posted in the past month
  • 40591 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second