Renovating and upgrading DH.04 road (Doc Luu - Cho Quan route), Ly Nhan district

Watching      
Project Overall procurement plan Contractor selection plan Contractor selection result
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: Ban Quản lý dự án đầu tư xây dựng huyện Lý Nhân
 ⚬ Old system: UBND huyện Lý Nhân
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor :
 ⚬ Contractor selection plan for phase 2 of the project: Renovating and upgrading DH.04 road (Doc Luu - Cho Quan route), Ly Nhan district

- The following contractor selection plans have the investor Ban Quản lý dự án đầu tư xây dựng huyện Lý Nhân:
 ⚬ Supplementing the contractor selection plan for phase 2 of the project: Renovating and upgrading DH.04 road (Doc Luu - Quan market route), Ly Nhan district

- The following bidding packages have the investor Ban Quản lý dự án đầu tư xây dựng huyện Lý Nhân:
 ⚬ Package No. 09: Traffic safety inspection

- The following bidding packages have the investor Ban Quản lý dự án đầu tư xây dựng huyện Lý Nhân:
 ⚬ Package No. 2: Survey consultancy, design of construction materials and estimation of phase II

 ⚬ Package No. 4: Construction supervision consultancy

 ⚬ Package No. 8: Static compression of BTC piles

 ⚬ Package No. 7: Audit consulting

 ⚬ Package No. 5: Construction work
Click để xem đầy đủClick để thu gọn
Found: 19:42 19/01/2021
Project number
20191280914-00
Notice type
Real announcement
Project name
Renovating and upgrading DH.04 road (Doc Luu - Cho Quan route), Ly Nhan district
Investor ID
vnz000013327
Project Category
Group B
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register
Project approval ID
2984/QĐ-UBND
Project approval date
30/12/2019
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
196.782.800.000 VND
2
196.782.800.000 VND
Total amount
393.565.600.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 1 0 0 0 9 0.00 8