Renovating and upgrading DT.818 section from NH1 - NHN2 (including 15Km of road and 08 bridges)

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: Sở Giao thông Vận tải tỉnh Long An
 ⚬ Old system: Sở Giao thông vận tải tỉnh Long An
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor :
 ⚬ Plan for selection of contractor for the project of Renovating and upgrading DT.818 section from NH1 - NHN2 (including 15Km of road and 08 bridges), the section from Bo Bo bridge to NH.N2

- The following contractor selection plans have the investor :
 ⚬ Plan for selection of contractor for the project to renovate and upgrade DT.818 section of National Highway 1 - NHN2 (including 15Km of road and 08 bridges) - Items of electricity for lighting and relocation of medium and low voltage power lines overpasses No. 3 Ho Chi Minh City – Trung Luong Expressway and Thu Thua Bridge

- The following bidding packages have the investor Ban Quản lý dự án Công trình giao thông:
 ⚬ Consulting, surveying, designing construction drawings - cost estimates: the section from the end of the road to Bo Bo bridge to National Highway N2 and T2 and T4 bridges

- The following bidding packages have the investor Ban Quản lý dự án Công trình giao thông:
 ⚬ Consulting on setting up the bidding documents and evaluating the bidding packages for the construction of electricity and lighting for overpass 3 and Thu Thua bridge

 ⚬ Construction supervision consultant for lighting construction of overpass 3 and Thu Thua bridge

 ⚬ Construction of lighting power for overpass 3 and Thu Thua bridge
Click để xem đầy đủClick để thu gọn
Found: 09:41 23/04/2022
Project number
20220459839-00
Notice type
Real announcement
Project name
Renovating and upgrading DT.818 section from NH1 - NHN2 (including 15Km of road and 08 bridges)
Investor ID
vn1101045721
Project Category
Group B
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
4871/QĐ-UBND ngày 25/12/2020 của UBND tỉnh Long An
Project approval date
25/12/2020
Project versions

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
650.000.000.000 VND VND
2
650.000.000.000 VND
Total amount
1.300.000.000.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 1 2 0 0 1 4 3.00 5
Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8361 Projects are waiting for contractors
  • 1157 Tender notices posted in the last 24 hours
  • 1868 Contractor selection plan posted in the last 24 hours
  • 24379 Tender notices posted in the past month
  • 38633 Contractor selection plan posted in the last month
You did not use the site, Click here to remain logged. Timeout: 60 second