Reviewing Vam Patch stream (from the ceremony to the Cau Vam Bridge)
Project number
PR2500026165-00
Notice type
Real announcement
Project name
Reviewing Vam Patch stream (from the ceremony to the Cau Vam Bridge)
Project objective
Ensure drainage, overcome flooding, environmental pollution in the area of Vam Patch stream area; create ventilation on both sides of the stream, improve the living environment for people in the area; gradually complete the transport infrastructure, technical infrastructure, create roads along the two sides of the stream; Urban embellishment of Phuoc Vinh urban area to call for investment attraction, attract people to settle down, production and business, ensure the goal of developing Phuoc Vinh urban lifting urban area to grade IV.
Authority
People's Committee of Phu Giao district
Project management Type
The investor directly manages the project
Implementation location (After merger)
Project approval ID
1283/QĐ-UBND
Project approval date
17/04/2025
Approval authority
UBND huyện Phú Giáo
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
QĐ 1283 Phe duyet du an Chinh trang suoi Vam Va.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans for this project
| NO |
Contractor selection plan ID |
Contractor selection plan name |
Total investment |
|
1
|
|
147.508.625 VND |
|
2
|
|
1.575.924.610 VND |
|
3
|
|
336.044.890.426 VND |
Total amount |
337.768.323.661 VND |
Statistical table of bidding packages under the project
| Statistics by type of bidding package |
Statistics by form |
Online bidding value (billion VND) |
Number of bidding packages whose results have been posted |
| Goods |
Civil Works |
Consulting |
Other categories |
Non-Consulting |
Online |
Offline |
| 0 |
1 |
28 |
0 |
2 |
5
|
26 |
391.34
|
24
|