Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: Ban Quản lý dự án Đầu tư xây dựng huyện Châu Thành, Hậu Giang
⚬ Old system: UBND huyện Châu Thành, tỉnh Hậu Giang
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Ban Quản lý dự án Đầu tư xây dựng huyện Châu Thành, Hậu Giang:
⚬ Road connecting Nga Sau town to South Song Hau street
- The following bidding packages have the investor Ban Quản lý dự án Đầu tư xây dựng huyện Châu Thành, Hậu Giang:
⚬ Construction drawing design consulting
⚬ Geological survey consulting service for construction drawing design
⚬ Estimation consulting
⚬ Consultancy and verification of construction drawing design
⚬ Appraisal of results of selection of supervision consultancy contractors
⚬ Evaluation of bidding documents for supervision consultancy
⚬ Prepare bidding documents, evaluate bids for supervision consultancy
⚬ Evaluation of construction contractor selection results
⚬ Evaluation of bidding documents, construction and installation requirements
⚬ Consulting on setting up Bid Documents and analyzing and evaluating construction bids
⚬ Consulting, monitoring and surveying the design steps of financial protection
⚬ Consulting on topographic and hydrological surveys for construction drawing design
⚬ Advice on setting up clearance landmarks
⚬ Clearing mines and explosives
⚬ Consulting on setting up survey tasks for the design steps of financial protection
⚬ Appraisal results of selection of BVTC design consultancy contractors
⚬ Appraisal of BVTC design consultancy bidding documents
⚬ Prepare bid documents, evaluate bids for design consultancy BVTC
⚬ Investigate, investigate, set up PA and DT to clear mines and explosives
Contractor selection plans for this project
NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
---|---|---|---|
1
|
180.000.000.000 VND |
||
Total amount |
180.000.000.000 VND |
Statistical table of bidding packages under the project
Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
---|---|---|---|---|---|---|---|---|
Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
0 | 0 | 0 | 0 | 0 | 0 | 35 | 0.00 | 22 |
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.