Route No. 05 (section from Provincial Road 914 to node N29, section from node N29 to bridge C16 and from bridge C16 to Tra Vinh canal) Dinh An economic zone (phase 1)

Watching    
Project Overall procurement plan Contractor selection plan
Found: 09:37 20/03/2026
Project number
PR2600011979-00
Notice type
Real announcement
Project name
Route No. 05 (section from Provincial Road 914 to node N29, section from node N29 to bridge C16 and from bridge C16 to Tra Vinh canal) Dinh An economic zone (phase 1)
Project objective
- Form a route along La Bang canal passing between the Industrial Park and Ngu Lac Industrial Service Zone to border Tra Vinh canal. Combined with Routes 1 and 2, Provincial Road 914 and National Highway 53, creating a transportation network serving functional areas such as: Industrial Park and Ngu Lac Industrial Service Area; Non-tariff zone; Don freshwater lake tourist entertainment and service area, ... gradually improving the infrastructure in Dinh An Economic Zone.
Investor ID
vn1501159787
Authority
Chairman of the People's Committee of Vinh Long province
Project duration
6 Year
Project Category
Group B
Project management Type
Other forms
Use of ODA funds
No
Implementation location
Xã Ngũ Lạc, ProvinceVĩnh Long
Investment Total Value
To view full information please Login or Register
Project approval ID
1847/QĐ-UBND
Project approval date
17/09/2018
Approval authority
Chủ tịch UBND tỉnh Trà Vinh (này là Chủ tịch UBND tỉnh Vĩnh Long)
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet
You did not use the site, Click here to remain logged. Timeout: 60 second