Solidifying canals in Ta Dam field area (L=1,000m), Long Binh 1 village
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2600012561-00
Notice type
Real announcement
Project name
Solidifying canals in Ta Dam field area (L=1,000m), Long Binh 1 village
Project objective
The canal route in Ta Dam field, Long Binh 1 village, Phuoc Dinh commune is currently mainly earthen canals, degraded, filled up, leaking a lot, with poor water conductivity, causing irrigation water loss, affecting agricultural production of people in the area. Investment in solidifying the canal is necessary to ensure a stable supply of irrigation water, improve water use efficiency and serve the development of sustainable agricultural production.
Authority
Chairman of Phuoc Dinh Commune People's Committee
Project management Type
The investor directly manages the project
Project approval ID
553/QĐ-UBND ngày 13/3/2026
Project approval date
13/03/2026
Approval authority
UBND xã Phước Dinh
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
QĐ phê duyệt BCKTKT 553 phe duyet bc kinh te ky thuat dau tu xd cong trinh kien co hoa kenh muong vung truong TA DAM.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet