Support for installing surveillance camera systems and early detection of forest fires under the project: Support for piloting the afforestation model to prevent natural disasters

Watching          
Found: 14:09 05/07/2024
Project number
PR2400034750-00
Notice type
Real announcement
Project name
Support for installing surveillance camera systems and early detection of forest fires under the project: Support for piloting the afforestation model to prevent natural disasters
Project objective
Strengthening the capacity of forest fire prevention and fighting in Quang Binh province by investing in perfecting specialized camera systems for early detection of forest fires, applying high-tech achievements of the electronics and information technology industry in fire warning forest; Improve the ability to command and proactively control forest fires, promptly detect fires when they first arise so that local authorities, forest owners and forest rangers can promptly mobilize forces to extinguish them immediately, without delay. to cause a big fire.
Investor ID
vn3100448954
Authority
Doan Ngoc Lam
Project duration
2 Year
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Quảng Trị
Investment Total Value
To view full information please Login or Register
Project approval ID
410/QĐ-UBND
Project approval date
26/02/2024
Approval authority
UBND tỉnh Quảng Bình
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
1.108.000.000 VND
Total amount
1.108.000.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 1 1 0 0 1 1 0.99 1
You did not use the site, Click here to remain logged. Timeout: 60 second