Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: SOUTHERN VIETNAM POWER PROJECTS MANAGEMENT BOARD
⚬ Old system: Tổng Công ty Truyền tải Điện Quốc Gia (EVNNPT)
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor :
⚬ LCNT plan T2 Ben Luc
⚬ Plan to select contractor for the first stage of investment in Tay Ninh 220kV substation project 2
- The following bidding packages have the investor SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD:
⚬ Package No. 1: "Provide consulting services for surveying, making technical design - construction cost estimate, construction drawing, bidding document"
⚬ Package No. 9: “Construction Insurance”
⚬ Package 7: “Construction and installation of substations and connections, (including supply of first-class VTTB connection and transport poles, conductors, lightning protection wires, accessory insulators, accessories OPGW fiber optic cables of the TZ to connect to) construction site
⚬ Package No. 8: "Survey and set up landmarks, measure and draw cadastral maps and consult compensation and site clearance work".
⚬ Package No. 6: "Supply and installation of secondary equipment and materials, configuration of protection control system, SCADA communication" including testing of remote measurement system (excluding calibration testing
⚬ Package 4: “Supply and transport transformer 220kV-250MVA”
⚬ Package 15: “Consultancy and supervision of 220kV-250MVA transformer installation and calibration test supervision (first + second)”
⚬ Package No. 5: “Supplying VTTB for substations (including testing and approving samples) and conductors, lightning conductors, insulators and accessories, OPGW optical cables and accessories for connection lines”
⚬ Package 12: “Audit the completed project settlement report”
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Contractor selection plans for this project
| NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
|---|---|---|---|
|
1
|
381.184.000.000 VND |
||
|
2
|
381.184.000.000 VND |
||
Total amount |
762.368.000.000 VND |
||
Statistical table of bidding packages under the project
| Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
|---|---|---|---|---|---|---|---|---|
| Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 16 | 0.00 | 10 |