"Tender package: Construction Supervision Consulting for project phase 2 in 2027", Belonging to Projects: Improving the reliability of 35kV and 22kV medium voltage power grid managed by Thanh Chuong Electricity Management Team in 2027; Improve the reliability of power supply on the 35kV medium voltage power grid managed by Nghia Dan - Thai Hoa Management Team in 2027; Improve the ability to operate medium and low voltage power grids to prevent overload, reduce power supply radius, reduce power loss and improve voltage quality on the power grid managed by Nghia Dan-Thai Hoa Management Team in 2027; Improve the capacity to operate the medium and low voltage power grid to prevent overload, reduce power supply radius, reduce power loss and improve voltage quality on the power grid managed by Dien Chau Electricity Management Team and Nghi Loc Electricity Management Team in 2027; Improving the capacity to operate the medium and low voltage power grid to prevent overload, reduce power supply radius, reduce power loss and improve voltage quality on the power grid by Anh Son Electricity Management Team and Do Luong Electricity Management Team management in 2027

Watching    
Project Overall procurement plan Contractor selection plan
Found: 15:52 23/06/2026
Project number
PR2600038681-00
Notice type
Real announcement
Project name
"Tender package: Construction Supervision Consulting for project phase 2 in 2027", Belonging to Projects: Improving the reliability of 35kV and 22kV medium voltage power grid managed by Thanh Chuong Electricity Management Team in 2027; Improve the reliability of power supply on the 35kV medium voltage power grid managed by Nghia Dan - Thai Hoa Management Team in 2027; Improve the ability to operate medium and low voltage power grids to prevent overload, reduce power supply radius, reduce power loss and improve voltage quality on the power grid managed by Nghia Dan-Thai Hoa Management Team in 2027; Improve the capacity to operate the medium and low voltage power grid to prevent overload, reduce power supply radius, reduce power loss and improve voltage quality on the power grid managed by Dien Chau Electricity Management Team and Nghi Loc Electricity Management Team in 2027; Improving the capacity to operate the medium and low voltage power grid to prevent overload, reduce power supply radius, reduce power loss and improve voltage quality on the power grid by Anh Son Electricity Management Team and Do Luong Electricity Management Team management in 2027
Investor ID
vnz000022500
Authority
Pham Cong Thanh
Project duration
90 Day
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Investment Total Value
To view full information please Login or Register
Project approval ID
3336/QĐ-PCNA
Project approval date
23/06/2026
Approval authority
Công ty Điện lực Nghệ An - CN Tổng công ty Điện lực miền Bắc
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet
You did not use the site, Click here to remain logged. Timeout: 60 second