The N7 drainage channel from KC3 to QL 1A
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2600061531-00
Notice type
Real announcement
Project name
The N7 drainage channel from KC3 to QL 1A
Project objective
Investment Objective: The N7 canal from KC3 to QL 1A
aims to repair damage to the canal and related infrastructure caused by the November 2025 storm and flooding, ensuring that the canal remains functional for water flow, irrigation, flood control, and efficient water management for agricultural purposes.
Task: To restore the irrigation function of the N7 canal specifically, and the entire irrigation system of Tuy An Bac Commune generally, which was damaged by the storm and flooding, to quickly restore water supply.
Project duration
2026 Year
Project management Type
The investor hired project management consultancy
Project approval date
26/08/2026
Approval authority
UBND xã Tuy An Bắc
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
QĐ phê duyệt báo cáo KTKT.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet