The solar lighting system is spring energy

Watching      
Project Overall procurement plan Contractor selection plan Contractor selection result
Found: 13:43 04/06/2025
Project number
PR2500034838-00
Notice type
Real announcement
Project name
The solar lighting system is spring energy
Project objective
The project of electric lighting system with solar energy in the spring village has a design length L = 1300m including 44 new pillars of 6m high galvanized steel (of which galvanized pillars with D135-D78 diameter 4m high, D78-D60 connector 2m high); Galvanized galvanization is needed for 2.2m long (the front surface is 1.5m; the tail is 700mm long); The battery is placed on the bolt connection tube; Solar LED lights; Removable battery + 80Ah 100w battery. - Light structure: 1.2m deep nail foundation is poured with 1x2 m200 concrete concrete on the layer of concrete
Investor ID
vn4200281531
Authority
People's Committee of Van Hung commune
Project duration
2025 Year
Project Category
Group C
Project management Type
The investor hired project management consultancy
Use of ODA funds
No
Implementation location
Huyện Vạn Ninh, ProvinceKhánh Hòa
Investment Total Value
To view full information please Login or Register
Project approval ID
135 /QĐ-UBND
Project approval date
02/06/2025
Approval authority
UBND xã Vạn Hưng
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
909.457.704 VND
2
79.566.760 VND
Total amount
989.024.464 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 1 4 0 0 0 5 0.00 5
You did not use the site, Click here to remain logged. Timeout: 60 second