To build a new residential area in Ha Hai village, Ha Ky commune, Tu Ky district; Item 1: Building an intersection to temporarily connect the way in and out of the new residential area in Ha Hai village, at Km37+220, on the right of provincial road 391; Item 2: Floor leveling, electricity supply, water supply and drainage

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: Hai duong traffic design conulting joint stock company
 ⚬ Old system: UBND xã Hà Kỳ
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor :
 ⚬ To build a new residential area in Ha Hai village, Ha Ky commune, Tu Ky district; Item 1: Building an intersection to temporarily connect the way in and out of the new residential area in Ha Hai village, at Km37+220, on the right of provincial road 391; Item 2: Floor leveling, electricity supply, water supply and drainage

- The following bidding packages have the investor Hai duong traffic design conulting joint stock company:
 ⚬ Package 06: Construction work + ensuring traffic
Click để xem đầy đủClick để thu gọn
Found: 14:42 18/07/2022
Project number
20220565091-01
Notice type
Real announcement
Project name
To build a new residential area in Ha Hai village, Ha Ky commune, Tu Ky district; Item 1: Building an intersection to temporarily connect the way in and out of the new residential area in Ha Hai village, at Km37+220, on the right of provincial road 391; Item 2: Floor leveling, electricity supply, water supply and drainage
Investor ID
vn0800011106
Project Category
Group C
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register
Project approval ID
2627/QĐ-UBND ngày 13/7/2022 của UBND huyện Tứ Kỳ
Project approval date
13/07/2022
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Project versions

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
8.757.039.000 VND
Total amount
8.757.039.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 0 0 0 0 9 0.00 1
You did not use the site, Click here to remain logged. Timeout: 60 second