DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: TRUNGSON HYDROPOWER COMPANY LIMITED
⚬ Old system: Trung Son Hydro Power Company Limited
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor Trung Son Hydro Power Company Limited:
⚬ The 23rd phase of contractor selection plan - Trung Son Hydropower Project
⚬ The plan to select the contractor for the 24th phase - Trung Son Hydropower Project
⚬ Plan to select contractor for phase 24, Trung Son hydropower project
⚬ Contractor selection plan to adjust CLIP-2 bidding packages in 2019
⚬ Approving the adjustment of the contractor selection plan for the package C-RE-08 - Trung Son Hydropower Project
⚬ Adjustment of contractor selection plan for package W-MW-12 “Emergency treatment downstream of the right shoulder of the dam below the height of 110.0 m (area 3)” - Trung Son hydropower project
⚬ Plan to select additional contractors 01 package W-MW-14 Additional reinforcement downstream of the spillway tip and left bank eroding hole roof (Area 4), Trung Son Hydropower Project
⚬ Approving the contractor selection plan: Adjusting the bidding package: Urgent handling of landslides downstream of the right shoulder of the dam after the storm No. 4 and the tropical convergence zone - Trung Son hydropower project
⚬ The plan to select the contractor for the 25th phase - Trung Son Hydropower Project
⚬ Contractor selection plan to adjust bidding package C-EMP-23 “Consulting for CLIP implementation phase 2 (04 individual consultants)”
⚬ The plan to select contractors for the 25th phase
- The following bidding packages have the investor Trung Son Hydro Power Company Limited:
⚬ W-MW-11 Emergency Treatment Downstream of the right shoulder of the dam, the height of 110.0m or more (area 2)
⚬ W-MW-14 Additional reinforcement downstream of the spillway launch tip and left bank eroding hole roof (Area 4)
⚬ W-MW-12 Emergency Treatment Downstream of the right shoulder dam below the height of 110.0m (area 3)
⚬ W-MW-08 Construction of equipment warehouse for Trung Son hydropower plant
⚬ W- PM-03 Repairing and upgrading the working area at the construction site into a working area and housing to serve management and operations at the construction site - Trung Son hydropower project
⚬ G-EMP-08.D-4A "Supply of CLIP -2 breeding cows (post-replication phase) in 2019"
⚬ G-EMP-08.D-6A "Supplying all kinds of fish stocked on the lake bed CLIP -2 (post-replication phase) in 2019"
⚬ G-EMP-08.D-1A "Supplying seeds of crops of all kinds CLIP -2 (post-replication phase) in 2019"
⚬ G-EMP-08.D-5A
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Contractor selection plans for this project
| NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
|---|---|---|---|
|
1
|
7.775.146.450.000 VND |
||
|
2
|
7.775.146.450.000 VND |
||
|
3
|
7.775.146.450.000 VND |
||
|
4
|
7.775.146.450.000 VND |
||
|
5
|
7.775.146.450.000 VND |
||
|
6
|
7.775.146.450.000 VND |
||
|
7
|
7.775.146.450.000 VND |
||
|
8
|
7.775.146.450.000 VND |
||
|
9
|
7.775.146.450.000 VND |
||
|
10
|
7.775.146.450.000 VND |
||
|
11
|
7.775.146.450.000 VND |
||
Total amount |
85.526.610.950.000 VND |
||
Statistical table of bidding packages under the project
| Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
|---|---|---|---|---|---|---|---|---|
| Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
| 0 | 0 | 0 | 0 | 0 | 0 | 56 | 0.00 | 9 |