Upgrading and reinforcing the Bac Bien dyke line, Dan Dien commune
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2600017481-00
Notice type
Real announcement
Project name
Upgrading and reinforcing the Bac Bien dyke line, Dan Dien commune
Project objective
- Upgrading and reinforcing dikes to ensure safety for about 70 hectares of land
agricultural production, improving the environmental landscape of the project area.
- Minimize damage caused by climate change and drought, reduce costs
production, contributing to increasing crop productivity and increasing income for people in the region
benefit.
Authority
Nguyen Ngoc Tien
Project management Type
The investor hired project management consultancy
Project approval ID
804/QĐ-UBND
Project approval date
10/04/2026
Approval authority
ỦY BAN NHÂN DÂN XÃ ĐAN ĐIỀN
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
H57.106-804-QD-UBND-2026-PL3_signed.pdf.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet