Upgrading and renovating the fire protection system in the Worker's Residence Block 1
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2300027793-00
Notice type
Real announcement
Project name
Upgrading and renovating the fire protection system in the Worker's Residence Block 1
Project objective
Upgrading and renovating the fire protection system and completing the legal procedures on fire prevention and fighting for the Block 1 Worker's Residence according to the design documents approved by the Police Department of Fire Prevention, Fire Fighting and Rescue of Ho Chi Minh City Police in Document No. 47/TD-PCCC dated January 13, 2020; in order to promptly serve the inspection and acceptance of fire prevention and fighting, meet the requirements according to the current regulations of the State on fire prevention and fighting, and at the same time proactively respond to fire and explosion situations.
Authority
Board of Directors of Hiep Phuoc Industrial Park Joint Stock Company
Project Category
Other projects
Project management Type
The investor directly manages the project
Implementation location
Huyện Nhà Bè, TP.Hồ Chí Minh
Project approval ID
23/2023/QĐ-HIPC-HĐQT
Project approval date
12/06/2023
Approval authority
Hội đồng Quản trị Công ty Cổ phần Khu công nghiệp Hiệp Phước
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
NQ so 23 _ PCCC NLTCN ngày 12.6.2023.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet