Village 2 Drainage System Project, Lien Co Village, Le Ninh Commune
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2600034186-00
Notice type
Real announcement
Project name
Village 2 Drainage System Project, Lien Co Village, Le Ninh Commune
Project objective
New construction of drainage system in village 2, Lien Co village, Le Ninh commune, total
length L= 320.26m. In it
+ Village route 2: L = 197.89m
+ Lien Co village route: L = 122.37 m. In which sewer line 1 L = 92.23 m,
Sewer line 2, L1 = 30.5 m.
Project management Type
The investor hired project management consultancy
Project approval ID
1787/QĐ-UBND
Project approval date
05/06/2026
Approval authority
UBND xã Lệ Ninh
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
1787-QĐ phê duyệt dự án Hệ thống thoát nước.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet