Project Code
PR2600056706-00
Publishing time
13:45 17/08/2026
Name of project
DATP component project 2-3: Construction of expressway from Saigon river to Thay Cai canal (including Phu Thuan bridge across Saigon river and Thay Cai bridge across Thay Cai canal)
Project List announced Entity
Domestic/ International
Domestic
Preliminary Total Project Cost
8.761.973.050.748 VNĐ
Amount in words
Eight trillion seven hundred sixty one billion nine hundred seventy three million fifty thousand seven hundred forty eight dong
Project capital structure
- Investor's Equity (VND): 859.050.000.000
- Loans and other legal capital sources of the Investor (VND): 4.867.930.000.000
- State capital in the project (if any) (VND): 3.035.000.000.000
Area of land used for the project
The land use area for the project (the area to be cleared for DATP 1-3 and DATP 2-3, which has been approved by the People's Committee of the city in Circular No. 3270/UBND-DA dated October 27, 2025 and Circular No. 311/UBND-DA dated January 16, 2026) is approximately 207.43 hectares.
Investment Objectives of the Project
Building a strategic transport axis connecting the Southeast region with the Southwest and Central Highlands, promoting the circulation of goods from industrial parks and urban areas to seaports and airports and vice versa; connecting urban areas and industrial parks in the region, creating regional links, socio-economic development of the southern key economic region; reduce traffic pressure for the urban center area; create new development space to exploit the potential of land resources and take advantage of areas with favorable conditions for urban development, contributing to regulating population in inner-city areas; successfully implement the goals and tasks of socio-economic development, ensuring national defense and security according to the Resolution of the 13th National Congress and the Party's resolutions.
Investment Scale of the Project
a) Project details: project type and level, design lifespan of the structure:
- Project type: National important project.
- Structure type: Road infrastructure.
- Structure level: Level I (details in the documentation).
- Design lifespan according to design: as per applicable design standards.
- The design consists of 3 stages: basic design, technical design, and construction drawing design.
b) Investment and construction scale:
- Highway section:
+ Phase 1: Initial investment with a capacity of 4 high-speed lanes, designed speed of 100 km/h according to National Technical Standards QCVN 117:2024/BGTVT for highways and TCVN 5729:2012 Standard for High-Speed Roads – Design Requirements;
+ Complete phase: capacity of 8 lanes, designed speed of 100 km/h.
- Construction of 3 bridges on the main route (including: Phu Thuan Bridge, Kênh N31A crossing bridge, Thầy Cai canal crossing bridge), according to TCVN 11823:2017 standard, Phase 1 investment capacity is 8 lanes according to the plan;
- Construction of 4 interconnected junctions and entry/exit points (connecting with the Saigon River road, Provincial Road 15; Ho Chi Minh City - Moc Bai highway; National Route 2 (now Phan Van Khai street); Tam Tân road; bridges in the junction comply with TCVN 11823:2017 standard;
- Construction of 4 direct overpasses (Pham Van Coi, Bui Thi Duet, Provincial Road 2, Nguyen Thi Rang); Phase 1 investment ensures connectivity with the current situation and facilitates further expansion according to the plan.
- Construction of other auxiliary structures to ensure the operational requirements of the highway (ITS, ETC systems, vehicle weighing control facilities, highway management centers; lighting systems at junctions and highway overpasses; traffic safety systems...).
Mechanism for sharing revenue increases and decreases
Have
• The mechanism for sharing the expected increase and decrease in revenue used to pay for the decrease in project revenue is implemented according to the provisions of Article 82 of the Law on Investment in the form of public-private partnership in 2020, which has been amended and supplemented with a number of Articles by Law No. 57/2024/QH15 dated November 29, 2024, Law No. 90/2025/QH15 dated June 25, 2020. 2025 and Decree No. 28/2021/ND-CP dated March 26, 2021 of the Government regulating the financial management mechanism of investment projects according to the public-private partnership method.
• Capital source expected to be used to pay for revenue reduction: from the Ho Chi Minh City Budget reserve.
Name of competent authority
Ban Quản lý dự án đầu tư xây dựng các công trình giao thông
Address: No. 3, Nguyen Thi Dieu, Xuan Hoa Ward, Ho Chi Minh City
Phone number: 0839330502
Fax:
Contracting agency
Ban Quản lý dự án đầu tư xây dựng các công trình giao thông
Address: No. 3, Nguyen Thi Dieu Street, Xuan Hoa Ward, Ho Chi Minh City
Phone number: 0839330502
Fax:
Time to start organizing investor selection
Quarter III/2026
Project to apply for Contractor Appointment / Investor Selection in special cases
Have
Form of investor selection
Selecting investors in special cases
Decision number
5109/QĐ-UBND
Ngày quyết định
16:59 13/08/2026
Decision Agency
Ủy ban nhân dân Thành phố Hồ Chí Minh
Investment policy code
IP2600000001-00
Created date
09:35 06/01/2026
Name of project
DATP component project 2-3: Construction of expressway from Saigon river to Thay Cai canal (including Phu Thuan bridge across Saigon river and Thay Cai bridge across Thay Cai canal)
Project Type
The project is established by the State
New technology/high-tech project
Are not
Project with special elements
Are not
Projects in industries and occupations that have not yet been marketed to foreign investors
Are not
Authority to decide investment policy
The project falls under the authority to decide investment policies of the Provincial People's Council
Project implementation time
Investment Objectives of the Project
Building a strategic transport axis connecting the Southeast region with the Southwest and Central Highlands, promoting the circulation of goods from industrial parks and urban areas to seaports and airports and vice versa; connecting urban areas and industrial parks in the region, creating regional links, socio-economic development of the southern key economic region; reduce traffic pressure for the urban center area; create new development space to exploit the potential of land resources and take advantage of areas with favorable conditions for urban development, contributing to regulating population in inner-city areas; successfully implement the goals and tasks of socio-economic development, ensuring national defense and security according to the Resolution of the 13th National Congress and the Party's resolutions.
Investment Scale of the Project
o Expressway: Phase 1: Investment with 04 expressway lanes, design speed 100km/h, roadbed width Base = 25.5m according to National Technical Regulations on Expressway QCVN 117:2024/BGTVT and Highway Motorway Standards - Design Requirements TCVN 5729:2012.
o Intersection design: arrange intersections at different levels to connect with intersections with Riverside Road, Ho Chi Minh City - Moc Bai Expressway, National Highway 22, Tam Tan Road; Direct intersection with crossroads Pham Van Coi, Bui Thi Diet, Nguyen Thi Ranh by overpass on the crossroads.
o Project group: Group A.
o Type and level of construction: traffic construction, level I.
Project location
Tay Nam Ward, Ho Chi Minh City; Nhuan Duc Commune, Ho Chi Minh City; Tan An Hoi Commune, Ho Chi Minh City; Hau Nghia Commune, Tay Ninh Province
Used ground and water surface area; need to use other resources (if any)
Preliminary land use needs of the Project are about 173.64 hectares. Site clearance according to planning scale of 74.5m wide.
Preliminary total investment
7.969.000.000.000 VND
Amount in words
Seven trillion nine hundred sixty nine billion dong
Project capital structure
- Investor's Equity (VND): 740.000.000.000
- Loans and other legal capital sources of the Investor (VND): 4.194.000.000.000
- State capital in the project (if any) (VND): 3.035.000.000.000
Expected price range, fees for products and public services for projects applying a direct fee collection mechanism from users
Incentives, investment guarantees
Mechanism for sharing revenue increases and decreases
Are not
Competent state agency
Management Board of Construction Investment Projects
Agency and unit in charge of receiving project proposals
Name of the investor proposing the project
Approval date
16:59 27/06/2025
Decision-making agency
Quốc hội
Approval Documents
NQ 220-QH về trủ trương ĐT DA Vd4.pdf
-->
NQ 220-QH về trủ trương ĐT DA Vd4.pdf