Invitation To Bid ( ITB, Tender Notice)

Tender package No 7: Supervision of topographic survey, supervision of dredging construction and transportation of dredged material to dumping

    Watching    
Find: 16:32 07/09/2022
Notice Status
Posted for the first time
Procurement Category
Consulting
Name of project
Dredging works to maintain Hai Phong navigational channel in 2021 (Lach Huyen section)
Name of Tender Notice
Tender package No 7: Supervision of topographic survey, supervision of dredging construction and transportation of dredged material to dumping
Contractor Selection Plan ID
Name of Contractor selection plan
Plan for contractor selection for Hai Phong navigation channel dredging and maintenance works in 2021 (Lach Huyen section)
Spending Category
Mandatory spending activities
Funding source
State budget allocated to carry out dredging and maintenance of navigational channels in 2021-2022
Range
Within the scope of the Law on Bidding
Method
Single Stage Single Envelope
Contract Type
All in one
Contract Period
To view full information, please Login or Register
Contractor selection methods
National competitive bidding
Contract Execution Location
Time of bid closing
17:00 27/09/2022
Validity period of E-HSDT
180 days

Participating in tenders

Bidding method
Online bidding
Tender documents submission start from
16:27 07/09/2022
to
17:00 27/09/2022
Document Submission Fees
Tender Document Submission at
To view full information, please Login or Register

Bid award

Award date
17:00 27/09/2022
Awarded at
Website: http://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bidding documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors Vietnam Maritime Administration as follows:

  • Has relationships with 46 contractor.
  • The average number of contractors participating in each bidding package is: 1.71 contractors.
  • Proportion of bidding fields: Goods 4.26%, Construction 5.32%, Consulting 89.36%, Non-consulting 0%, Mixed 1.06%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 239,861,785,349 VND, in which the total winning value is: 227,340,568,817 VND.
  • The savings rate is: 5.22%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Tender package No 7: Supervision of topographic survey, supervision of dredging construction and transportation of dredged material to dumping". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Tender package No 7: Supervision of topographic survey, supervision of dredging construction and transportation of dredged material to dumping" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 31

You did not use the site, Click here to remain logged. Timeout: 60 second