03-SS3TV: Verification of pre-feasibility study report, feasibility study report, technical design and estimate, construction drawing design of Se San 3 Hydropower Plant Expansion Project
03-SS3TV: Verification of pre-feasibility study report, feasibility study report, technical design and estimate, construction drawing design of Se San 3 Hydropower Plant Expansion Project
Contractor selection plan for package 03-SS3TV: Verification of pre-feasibility study report, feasibility study report, technical design and estimate, construction drawing design of Se San 3 Hydropower Plant Expansion Project
Contract execution period
59 day
Contractor selection methods
Competitive Bidding
Contract Type
All in one
Award date
10:00 14/01/2026
Bid opening completion time
11:03 14/01/2026
Tender value
Complete opening of technical documents without bidding package price