Installing the drainage system on April 30 street (section from Bau Trung alley to Cach Mang street
August; from Hoang Lac wedding dress to Cach Mang Thang 8 street); 3/2 Street (section from Cach Mang Thang 8 Street to Long My Bridge); New construction of drainage system in Binh Thanh area