Repairing road surface of the segments of km0+000 - km3+100; Section Km3+800 - Km7+430 (right route) and paragraph Km5+550 - Km7+430 (left route); Repairing the system of drainage grooves, woven grooves, bundles, traffic safety systems on the road connecting NH.1 with Ninh Phuc port