Consulting on surveys, preparing economic-technical reports, Project: Repairing the foundation, road surface, curbs and drainage ditches along the section Km0-Km0+270; Km1-Km1+800; Km23+200-Km23+500; Km26+550-Km29+500; Repairing Kim Giao bridge - Km36+398/National Highway 49C, Quang Tri province
Consulting on surveys, preparing economic-technical reports, Project: Repairing the foundation, road surface, curbs and drainage ditches along the section Km0-Km0+270; Km1-Km1+800; Km23+200-Km23+500; Km26+550-Km29+500; Repairing Kim Giao bridge - Km36+398/National Highway 49C, Quang Tri province
Repairing the foundation, road surface, curb and drainage ditch along section Km0-Km0+270; Km1-Km1+800; Km23+200-Km23+500; Km26+550- Km29+500; Repairing Kim Giao bridge - Km36+398/National Highway 49C, Quang Tri province