1. Tải về báo cáo đánh giá kĩ thuật - Không có file báo cáo 2. Tải về văn bản phê duyệt danh sách NT đạt kĩ thuật - Không có file báo cáo 3. Tải về file báo cáo đánh giá tổng hợp -07 - Bao cao danh gia Ho so bao gia.pdf
The contractor does not attach drawings and designs as required in the E-HSYC and Official Letter requesting clarification of the E-HSBG of the bidding package within the prescribed time so that the Procuring Entity has a basis to evaluate and select the contractor.
The contractor does not attach drawings and designs as required in the E-HSYC and Official Letter requesting clarification of the E-HSBG of the bidding package within the prescribed time so that the Procuring Entity has a basis to evaluate and select the contractor.
- The contractor does not attach drawings and designs as required in the E-HSYC and Official Letter requesting clarification of the E-HSBG of the bidding package within the prescribed time so that the Procuring Entity has a basis for evaluating and selecting the contractor.
In addition, the contractor's Bid Form had the wrong package name.