Package 03: Construction of project to improve the quality of medium and low voltage power grid in 2024-2025 for CC substations in area 3, Thanh Chuong district, Nghe An province
Package 03: Construction of project to improve the quality of medium and low voltage power grid in 2024-2025 for CC substations in area 3, Thanh Chuong district, Nghe An province
Investor
NGHE AN POWER COMPANY - BARANCH OF NORTHERN POWER CORPORATION
Contractor selection plan Project: Improving the quality of medium and low voltage power grid in 2024-2025 for CC substations in area 3, Thanh Chuong district, Nghe An province