Package 03: Consulting survey, preparation of feasibility study report (including hydrological calculation, flood drainage capacity, dike safety) under Van Phuc Bridge Construction Investment Project across Red River and the route connecting to Highway 32, Phuc Tho district
Package 03: Consulting survey, preparation of feasibility study report (including hydrological calculation, flood drainage capacity, dike safety) under Van Phuc Bridge Construction Investment Project across Red River and the route connecting to Highway 32, Phuc Tho district
Investor
Ban Quản lý dự án đầu tư xây dựng công trình giao thông Thành phố Hà Nội
Planning and construction phase of investment preparation investment project of construction of Van Phuc bridge across the Red River and the route connecting National Highway 32, Phuc Tho district
#1
Liên danh Tổng công ty Tư vấn thiết kế Giao thông vận tải - CTCP, Công ty Cổ phần Xây dựng VNC và Viện Khoa học Thủy lợi Việt Nam (gọi tắt là: Liên danh TEDI-VNC-VAWR).
Business Registration ID ( on new Public Procuring System)