The contractor selection plan reports the technical and technical investment in construction of bridge repair works No. 3 at Km8+448 on Suoi Tre - Binh Loc road; Bridge No. 1 at Km23+884, Bridge No. 2 at Km28+850, Suoi Dau Bridge at Km37+850 on Xuan Bac - Thanh Son route