Package 14: Construction of items of the Project (including construction, construction equipment, technical systems according to approved design documents: electricity, water, fire protection, air conditioning, etc.) lightning protection, communication)
Package 14: Construction of items of the Project (including construction, construction equipment, technical systems according to approved design documents: electricity, water, fire protection, air conditioning, etc.) lightning protection, communication)
Investor
Ban Quản lý dự án đầu tư xây dựng công trinh dân dụng và công nghiệp tỉnh Đồng Tháp