Package 18: Construction and relocation of the electrical system and new construction of the lighting system (items from Km15+451 to the end of the route and branch connecting to Tel.953)
Package 18: Construction and relocation of the electrical system and new construction of the lighting system (items from Km15+451 to the end of the route and branch connecting to Tel.953)
Investor
Ban Quản lý dự án đầu tư xây dựng công trình giao thông và nông nghiệp tỉnh An Giang
Supplementing the project contractor selection plan: Building a regional link from Tan Chau town to Chau Doc city, connecting with Kien Giang and Dong Thap provinces