Contractor Selection Plan Name
Repairing damage to the foundation and road surface of sections Km504+850 - Km505+260, Km505+380 - Km505+810, Km506+936 - Km507+250, Km507+500 - Km507+790, Km511+650 - Km512+00, Km536 +950 - Km537+600, Km561+100 - Km561+450, Km569+200 - Km570+250, Km571+150 - Km572+160; Repairing longitudinal trenches at section Km537+950 - Km538+100 (P); Km547+630 - Km547+850 (P); Km547+630 - Km547+780 (T); Km547+970 - Km548+150 (P); Km547+980 - Km548+315 (T); Repair of bridges: Quang Trung Km512+430, Bac Canal Km566+065, Hon Lu Km573+974, Don Village Km582+864, Member II Km585+748, Ben Nha Km586+163, Song Xanh Km590+256, Thuong Ninh I Km591+160, Cu Duc Km591+852, Yen Cat Km600+416, Luong Dong Km604+094, Chili Field I Km602+718, Chili Field II Km603+096, La So Km608+818, CT04 Km631+644; Repair the signage system and strengthen the traffic safety system on the national highway passing the school from Km503+00 - Km632+600; Repair lighting system Km521+00 - Km524+420, Km541+430 - Km543+200, Km565+500 - Km565+800, Ho Chi Minh road. Repairing signs from Km0+00 - Km0+643 Branch 1, Km0+00 - Km0+506 Branch 2, Km0+00 - Km0+409 Branch 3, Km9+00 - Km54+540; Strengthening the traffic safety system on the national highway passing through schools, section Km20+500 - Km54+450, road connecting Nghi Son port - Ho Chi Minh road (Bai Tranh), Thanh Hoa province