The adjusted cost estimate varies significantly and may affect the contractor selection plan (Articles 17 & 18, Decree 10/2021/ND-CP).
The bid price of CÔNG TY CỔ PHẦN TƯ VẤN NĂNG LƯỢNG is unusually low and requires verification of the bidder's ability to execute the contract (Decree 214/2025/ND-CP).
Plan for selecting construction contractors: “(i) Improving the architecture of E1.1 Dong Anh Station for the operation management and operation of the TT & NGLH 1 Team, Hanoi High -Voltage Grid Company; (II) Renovating the ground surface of the OPy yard 110kV and flooding and flood drainage system at E1.1 Dong Anh Station"