Contractor Selection Plan Name
Repair damage to the background, road surface of the segments of km11+675 - km12+150, km13+150 - km13+413; Km13+676 - Km13+900, Km25+020 - Km25+410, Km26+340 - KM26+680, Km30+630 - Km32+630, Km32+795 - Km33+466, Km34+690 - Km34+900, Km52+50 - Km52+570, Km53+100 - Km53+500 km54+500 km54+Km55 -+105 -+105 -+105 -+105 -+105 Km55+450, km56+00 - km57+100, km59+400 -km59+560, km60+200 - km60+500; Repairing grooves along the segments Km4+040 -Km4+230 (t), km4+860 - km4+1000 (t), km5+645 - km5+770 (t), km14+700 - km14+790 (p), km20+330 - km20+450 (t), km24+110 - km24+480 (t), km35+722+800+km35+850 Km35+930 (T), Km58+790 - Km58+815 (T), Km59+020 - Km59+280 (T), Km61+350 - Km61+480 (P); Repair Nghia Hy Bridge KM11+650, Color Bridge KM25+430, Dien Dong Bridge Km43+818, KM51+513 Bridge, Bong Kho Bong Bridge KM51+973 Highway 9, Quang Tri Province