Package 6: Construction and repair of 35kV transmission line from XT pole to 12M pole, Duong O branch branch, road 384-E7.4; 35kV transmission line from pole 1 to pole 14 of highway 373-E27.1 and substations of Nui Mong, Nui Mong 2, No. 1 Tien Son Urban Area, No. 5 Tien Son Urban Area, No. 6 Tien Son Urban Area; 22kV transmission line from pole 42 to pole 48M highway 483-E27.8; Tam Tao branch 1 road 478-E27.1; Repairing Dong Lang substation 481-E27.26
Package 6: Construction and repair of 35kV transmission line from XT pole to 12M pole, Duong O branch branch, road 384-E7.4; 35kV transmission line from pole 1 to pole 14 of highway 373-E27.1 and substations of Nui Mong, Nui Mong 2, No. 1 Tien Son Urban Area, No. 5 Tien Son Urban Area, No. 6 Tien Son Urban Area; 22kV transmission line from pole 42 to pole 48M highway 483-E27.8; Tam Tao branch 1 road 478-E27.1; Repairing Dong Lang substation 481-E27.26
Investor
Công ty Điện lực Bắc Ninh - Tổng Công ty Điện lực miền Bắc; Địa chỉ: Số 308 - đường Lạc Long Quân – phường Hòa Long – TP Bắc Ninh - Tỉnh Bắc Ninh; Số điện thoại: 02223.512.742; Số fax: 02223.822.972
1. Tải về báo cáo đánh giá kĩ thuật - Không có file báo cáo 2. Tải về văn bản phê duyệt danh sách NT đạt kĩ thuật - Không có file báo cáo 3. Tải về file báo cáo đánh giá tổng hợp -BCDG goi 6.pdf