Outline of tasks, cost estimates for preparing the feasibility study report, verifying the design of the Technical and Urban Hospital, preparing the Bidding Documents, evaluating the Bidding Documents and contractor selection plan at the construction investment preparation stage: Repairing the Conference Center Muong Te district cultural conference