Tender package No 04.XL: Construction of the following items: (i). To renovate and upgrade the flood-passing road at the foundation and surface of Tran Phu street; (ii). Renovating and dredging Khe Leo drainage canal; (iii). Renovating Nguyen Hue Street; (iv). Improving Huy Can Street; (v). Improving Bach Ngoc Street; (Because). Rehabilitation of drainage ditch N22; (vii). Power supply system according to approved construction drawing design documents
Tender package No 04.XL: Construction of the following items: (i). To renovate and upgrade the flood-passing road at the foundation and surface of Tran Phu street; (ii). Renovating and dredging Khe Leo drainage canal; (iii). Renovating Nguyen Hue Street; (iv). Improving Huy Can Street; (v). Improving Bach Ngoc Street; (Because). Rehabilitation of drainage ditch N22; (vii). Power supply system according to approved construction drawing design documents
plan to select contractors for bidding packages under the Huong Khe Urban Infrastructure Improvement Sub-Project, Huong Khe District, Ha Tinh Province under the Project "Improving urban infrastructure to minimize the impact of climate change" climate change for 04 coastal provinces in the North Central Coast”