Contractor selection plan for bidding packages under the category: Moving 22kV power lines and 0.4kV power lines under the Project: Investment in building a road parallel to Ring Road 5 - Hanoi Capital Region (phase 1), the section from the intersection connecting with National Highway 21B (on the right bank of the Nhue River) to the intersection with Le Cong Thanh street, phase 3 (68m road) and on one side the section from Phu Thu intersection to the intersection. with a road connecting two highways in Binh Nghia commune, Binh Luc district