Project: Unscheduled repair of landslides and re-roading of sections Km48+260-Km48+280, Km55+080-Km55+090, Km79+340- Km79+350; Repair damaged road surface at Km84+500 Km84+515; Repair damage to 02 bridges Km72+874, Km73+693 and repair and reinforce cross-road drainage culverts at Km72+400, Km72+753, Km73+280, Km75+152, Km82+870 and vertical drainage ditches at section Km73+183-Km73+652 combined with local repair of road surface and shoulder damage road on National Highway 279D