Bidder Selection Plan

1. Completing OPGW optical cable infrastructure for connecting inter -provincial transmission channels - Thai Nguyen Power Company; 2.

  Watching      
Find: 08:58 04/07/2025
Contractor Selection Plan ID
PL2500162806-00
Publishing time
08:40 04/07/2025
Posting Status
Published
Contractor selection plan name
1. Completing OPGW optical cable infrastructure for connecting inter -provincial transmission channels - Thai Nguyen Power Company; 2.
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2500034883-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Other project
Project implementation time
12 Month
Authority that issues the decision
Công ty Điện lực Thái Nguyên - Chi nhánh Tổng Công ty Điện lực miền Bắc
Approval date
28/06/2025
Approval ID
1610/QĐ-PCTN ngày 22/6/2025; 1739/QĐ-PCTN ngày 28/6/2025
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 3
1.Package 2A: Construction and supply of materials
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction and supply of materials
Capital source details
KHCB of EVNNPC
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Thái Nguyên
2.Package 3A: Supervision of construction and installation of equipment
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction supervision and equipment installation
Capital source details
KHCB of EVNNPC
Contractor Selection Type
Do it yourself
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Thái Nguyên
3.Package 5A: Construction insurance
Tender/ Prequalification Notice ID
Contract execution period
120 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction insurance
Capital source details
KHCB of EVNNPC
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Third quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Thái Nguyên

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "1. Completing OPGW optical cable infrastructure for connecting inter -provincial transmission channels - Thai Nguyen Power Company; 2.". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "1. Completing OPGW optical cable infrastructure for connecting inter -provincial transmission channels - Thai Nguyen Power Company; 2." plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 10

You did not use the site, Click here to remain logged. Timeout: 60 second