Bidder Selection Plan

Adjusting the contractor selection plan (Phase 1) Project "Building infrastructure to adapt to climate change for ethnic minorities (CRIEM) - Component project of Quang Tri province"

  Watching      
Find: 15:16 30/10/2024
Contractor Selection Plan ID
PL2400054186-02
Publishing time
15:14 30/10/2024
Posting Status
Published
Contractor selection plan name
Adjusting the contractor selection plan (Phase 1) Project "Building infrastructure to adapt to climate change for ethnic minorities (CRIEM) - Component project of Quang Tri province"
Investment objective
- Overall goal of the Project: Improve opportunities for livelihood development, reduce poverty and inequality for ethnic minorities through developing integrated infrastructure investment to adapt to climate change . - Specific objective: Invest in upgrading transportation infrastructure and improving production infrastructure to support economic development for ethnic minorities.
Project management forms
The investor directly manages the project
Using ODA capital?
Have
Funding source
ODA capital
Project number
PR2400015517-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
6 Years
Authority that issues the decision
UBND tỉnh Quảng Trị
Approval date
28/10/2024
Approval ID
2590/QĐ-UBND
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Lowest bid price, Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Filter name, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 21
1.Bidding package No. CRIEM-TV11: Consulting on preparing survey task outlines and designing construction drawings for transportation subprojects under Component 1
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare an outline of survey tasks and design construction drawings for transportation subprojects under Component 1
Capital source details
Project's reciprocal capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
2.Bidding package No. CRIEM-TV12: Consulting on preparing survey task outlines and designing construction drawings for water supply subprojects under Component 2
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare an outline of survey tasks and design construction drawings for water supply subprojects under Component 2
Capital source details
Project's reciprocal capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
3.Tender package No CRIEM-TV13: Survey consulting, construction drawing design and estimates, site clearance pile design for subproject: Upgrading and renovating Khe Sanh - Sa Tram road, Huong Hoa district
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey, design construction drawings and estimates, design site clearance piles for the subproject: Upgrading and renovating Khe Sanh - Sa Tram road, Huong Hoa district
Capital source details
Project's reciprocal capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
4.Tender package No CRIEM-TV14: Survey consulting, construction drawing design and estimates, site clearance pile design for the subproject: Upgrading and renovating Cha Ly - Cu Bai inter-village road, Huong Lap commune, Huong district Chemistry
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey, design construction drawings and estimates, design site clearance piles for the subproject: Upgrading and renovating Cha Ly - Cu Bai inter-village road, Huong Lap commune, Huong Hoa district
Capital source details
Project's reciprocal capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
5.Tender package No CRIEM-TV15: Survey consulting, construction drawing design and estimates, site clearance pile design for subproject: Upgrading and renovating inter-commune road Huc - Ba Floor, Huong Hoa district
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey, design construction drawings and estimates, design site clearance piles for the subproject: Upgrading and renovating inter-commune road Huc - Ba Floor, Huong Hoa district
Capital source details
Project's reciprocal capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
6.Bid package number CRIEM-TV16: Survey consulting, construction drawing design and estimates, site clearance pile design for subproject: Upgrading and renovating central roads in A Doi commune, Huong Hoa district
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey, design construction drawings and estimates, design site clearance piles for the subproject: Upgrading and renovating central roads in A Doi commune, Huong Hoa district
Capital source details
Project's reciprocal capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
7.Tender package No CRIEM-TV17: Survey consulting, construction drawing design and estimates, site clearance pile design for the subproject: Upgrading and improving roads from Dakrong district center to Ba Long commune, Dakrong district
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey, design construction drawings and estimates, design site clearance piles for the subproject: Upgrading and renovating roads from Dakrong district center to Ba Long commune, Dakrong district
Capital source details
Project's reciprocal capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
8.Tender package No CRIEM-TV18: Survey consulting, construction drawing design and estimates, site clearance pile design for subproject: Construction of clean water supply system in Huong Linh commune and Tan Hop commune, Huong Hoa district
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey, design construction drawings and estimates, design site clearance piles for the subproject: Construction of clean water supply system in Huong Linh commune and Tan Hop commune, Huong Hoa district
Capital source details
Project's reciprocal capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
9.Tender package No CRIEM-TV19: Survey consulting, construction drawing design and estimates, site clearance pile design for subproject: Construction of clean water supply system in Lia and Xy communes, Huong Hoa district
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey, design construction drawings and estimates, design site clearance piles for the subproject: Construction of clean water supply systems in Lia and Xy communes, Huong Hoa district
Capital source details
Project's reciprocal capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
10.Tender package No CRIEM-TV20: Survey consulting, construction drawing design and estimates, site clearance pile design for subproject: Construction of clean water supply system in KrongKlang town and Mo O commune, Huong Hiep commune
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Survey, design construction drawings and estimates, design site clearance piles for the subproject: Construction of clean water supply system in KrongKlang town and Mo O commune, Huong Hiep commune
Capital source details
Project's reciprocal capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
11.Bid package No. CRIEM-TV21: Consulting, supervising and surveying the design and construction drawing steps of Component 1 subprojects
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise and survey the design and construction drawing steps of Component 1 subprojects
Capital source details
Project's reciprocal capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
12.Bid package No. CRIEM-TV22: Consulting, supervising and surveying the design and construction drawing steps of Component 2 subprojects
Tender/ Prequalification Notice ID
Contract execution period
50 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervise and survey the design and construction drawing steps of Component 2 subprojects
Capital source details
Project's reciprocal capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
13.Bidding package No. CRIEM-TV23: Consulting on verification of construction drawing designs and estimates of Component 1 subprojects
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify construction drawing designs and estimates of Component 1 subprojects
Capital source details
Project's reciprocal capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
14.Bidding package No. CRIEM-TV24: Consulting on verification of construction drawing designs and estimates of Component 2 subprojects
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
Verify construction drawing designs and estimates of Component 2 subprojects
Capital source details
Project's reciprocal capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
15.Bidding package number CRIEM-TV25: Price appraisal consultancy
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Valuation
Capital source details
Project's reciprocal capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
16.Tender package No CRIEM-TV26: Consulting on site clearance pile installation and cadastral surveying for land recovery
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Install site clearance stakes and conduct cadastral measurements to serve land recovery
Capital source details
Project's reciprocal capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q3 2024
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
17.Bidding package number CRIEM-TV27: Consulting on specific land valuation
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Specific land valuation
Capital source details
Project's reciprocal capital
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
18.Bidding package No. CRIEM-TV28: Consulting on preparing bidding documents for bidding packages Consulting on surveying, designing, and estimating financial protection
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Prepare bidding documents for bidding packages, consulting, surveying, designing, and estimating financial protection
Capital source details
Project's reciprocal capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
19.Tender package No CRIEM-TVBM: Consulting on preparing technical construction plans and estimates for clearance of bombs, mines and explosives
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Preparation of construction technical plans and estimates for demining of mines and explosives
Capital source details
Project's reciprocal capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
20.Tender package No CRIEM-RPBM: Construction of bomb, mine and explosive material clearance
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Construction of clearing mines and explosives
Capital source details
Project's reciprocal capital
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province
21.Tender package No CRIEM-GSBM: Consulting on supervision of bomb, mine and explosive material clearance
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Supervising the clearance of mines and explosives
Capital source details
Project's reciprocal capital
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Quang Tri province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Adjusting the contractor selection plan (Phase 1) Project "Building infrastructure to adapt to climate change for ethnic minorities (CRIEM) - Component project of Quang Tri province"". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Adjusting the contractor selection plan (Phase 1) Project "Building infrastructure to adapt to climate change for ethnic minorities (CRIEM) - Component project of Quang Tri province"" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.