Approval of investment policy, total investment estimate and contractor selection plan for investment preparation phase Project: Renovating and repairing 2nd floor corner room, 2nd floor WC area, paving 2nd floor hallway of old house 3rd floor, replacement of main doors, magnetic locks on room doors of block A, stone cladding in elevator areas 1-2, aluminum and glass doors, waiting chairs, wardrobes, decorative walls in the reception area, railings on magnetic floors 1st floor to 5th floor - Dien Dien Hotel
Approval of investment policy, total investment estimate and contractor selection plan for investment preparation phase Project: Renovating and repairing 2nd floor corner room, 2nd floor WC area, paving 2nd floor hallway of old house 3rd floor, replacement of main doors, magnetic locks on room doors of block A, stone cladding in elevator areas 1-2, aluminum and glass doors, waiting chairs, wardrobes, decorative walls in the reception area, railings on magnetic floors 1st floor to 5th floor - Dien Dien Hotel
Renovating and repairing the corner room on the 2nd floor, the 2nd floor WC area, paving the hallway on the 2nd floor of the old house on the 3rd floor, replacing the main doors, magnetic locks on the room doors of block A, stone cladding in elevator areas 1-2, the Aluminum glass doors, waiting chairs, wardrobes, walls decorating the reception area, railings on floors from 1st to 5th floors - Dien Dien Hotel
CÔNG TY TNHH MỘT THÀNH VIÊN KHÁCH SẠN - DU LỊCH VÀ DỊCH VỤ THƯƠNG MẠI ĐIỆN LỰC
Approval date
10/05/2024
Approval ID
20/QĐ-NPCHTT
Approval Documents
Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info. Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register
KHLCNT - KHÁCH SẠN ĐIỆN LỰC.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!! In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 5
1.Package 1: Consulting on making economic and technical reports
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Approval of investment policy, total investment estimate and contractor selection plan for investment preparation phase Project: Renovating and repairing 2nd floor corner room, 2nd floor WC area, paving 2nd floor hallway of old house 3rd floor, replacement of main doors, magnetic locks on room doors of block A, stone cladding in elevator areas 1-2, aluminum and glass doors, waiting chairs, wardrobes, decorative walls in the reception area, railings on magnetic floors 1st floor to 5th floor - Dien Dien Hotel". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Approval of investment policy, total investment estimate and contractor selection plan for investment preparation phase Project: Renovating and repairing 2nd floor corner room, 2nd floor WC area, paving 2nd floor hallway of old house 3rd floor, replacement of main doors, magnetic locks on room doors of block A, stone cladding in elevator areas 1-2, aluminum and glass doors, waiting chairs, wardrobes, decorative walls in the reception area, railings on magnetic floors 1st floor to 5th floor - Dien Dien Hotel" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.