Bidder Selection Plan

Approve construction drawing design documents - estimates and construction contractor selection plans

  Watching  
Project Contractor selection plan Bid award
Find: 14:50 14/04/2025
Contractor Selection Plan ID
PL2500079425-00
Publishing time
14:48 14/04/2025
Posting Status
Published
Contractor selection plan name
Approve construction drawing design documents - estimates and construction contractor selection plans
Procurement name
Category: Repairing door systems, classroom windows.
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Shopping budget
To view full information, please Login or Register
Spending Category
Mandatory spending
Authority that issues the decision
Trường Tiểu học Cát Thành
Approval date
11/04/2025
Approval ID
31/QĐ-TH
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Repairing door systems, classroom windows.
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
a. Repairing the door system, windows of classrooms of 02 -storey class 10 rooms: - Removing 07 sets of D1 doors in the first floor of damaged wood, replaced with electrostatic aluminum door 1000, under the aluminum lamri, above 5ly thick white glass, iron flower protecting steel doors of 12x12x1.4mm galvanized steel box is painted complete. - Remove 03 sets of S1 windows on the first floor of damaged wood, replaced with electrostatic aluminum door 700, 5ly thick white glass, iron flower protection steel doors galvanized box 12x12x1.4mm are painted completely. - Replace the wind hook, close the existing wooden doors. - Replace 01 broken window glass plate (0.35x1,15) m. - Cleaning and waterproofing the roof of the slave. b. Repairing the door system, windows of classrooms of 02 -floor classroom 06 rooms: - Remove 01 set of D1 doors in the first floor of damaged wood, replaced with electrostatic aluminum doors with 1000 system, under the aluminum lamri, above 5ly thick white glass, iron flower protecting steel doors of galvanized boxes of 12x12x1.4mm is painted complete. - Replace the wind hook, close the existing wooden doors. c. Row of 4 -room classrooms: - Replace 02 broken window glass panels (0.46x0,56) m. d. Row of hall houses: - Replace 03 sets of round locks. e. Thick waiting room (Chanh Thang school): - Replace 01 set of wipers. Detailed contents of the project according to the construction drawing design dossier - the estimates of the consulting unit have verified.
Capital source details
Capital expenses for regular education in 2025.
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Second quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Phù Cát District, Gia Lai
Implementation location (Before merge)
Pacify the province

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Approve construction drawing design documents - estimates and construction contractor selection plans". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Approve construction drawing design documents - estimates and construction contractor selection plans" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 5

You did not use the site, Click here to remain logged. Timeout: 60 second