Bidder Selection Plan

Audit of construction investment projects in 2024, phase 2 Projects in 2024 include: 1. Development of public low-voltage stations and grids to prevent overload for existing public stations after installing 3-phase galvanometers in District 12 in 2024. 2. Develop an MBA station recovered after TCCS to fully handle the existing public station load in District 12 in 2024. 3. TCCS 8 stations from 250kVA to 400kVA and 5 stations from 400kVA to 560kVA to prevent overload in District 12 in 2024. 4. Construction and installation of switching equipment with SCADA function - 2022. 5. Renovate and build a new connection to the medium voltage line in District 12, 2024

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 14:23 14/10/2024
Contractor Selection Plan ID
PL2400231204-00
Publishing time
14:22 14/10/2024
Posting Status
Published
Contractor selection plan name
Audit of construction investment projects in 2024, phase 2 Projects in 2024 include: 1. Development of public low-voltage stations and grids to prevent overload for existing public stations after installing 3-phase galvanometers in District 12 in 2024. 2. Develop an MBA station recovered after TCCS to fully handle the existing public station load in District 12 in 2024. 3. TCCS 8 stations from 250kVA to 400kVA and 5 stations from 400kVA to 560kVA to prevent overload in District 12 in 2024. 4. Construction and installation of switching equipment with SCADA function - 2022. 5. Renovate and build a new connection to the medium voltage line in District 12, 2024
Name of project
Audit of construction investment projects in 2024, phase 2 of 2024 projects including: 1. Development of public low-voltage stations and grids to prevent overloading of existing public stations after installing 3-phase galvanometers in the area District 12 in 2024. 2. Develop a station with an MBA recovered after TCCS to fully handle the existing public station load in District 12 in 2024. 3. TCCS 8 250kVA stations to 400kVA and 5 400kVA stations to 560kVA to Prevent overloading in District 12 in 2024. 4. Construction and installation of switching equipment with SCADA function - 2022. 5. Renovate and build a new connection to the medium voltage line in District 12, 2024
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Other
Authority that issues the decision
Công ty Điện lực An Phú đông
Approval date
09/10/2024
Approval ID
2379/QĐ-PCAD9
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 1
1.Audit of construction investment projects in 2024, phase 2 Projects in 2024 include: 1. Develop public low-voltage stations and grids to prevent overload for existing public stations after installing 3-phase galvanometers in District 12 in 2024. 2. Develop an MBA station recovered after TCCS to fully handle the existing public station load in District 12 in 2024. 3. TCCS 8 stations from 250kVA to 400kVA and 5 stations from 400kVA to 560kVA to prevent overload in District 12 in 2024. 4. Construction and installation of switching equipment with SCADA function - 2022. 5. Renovate and build a new connection to the medium voltage line in District 12, 2024
Tender/ Prequalification Notice ID
Contract execution period
15 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
KHCB and KHCB + TDTM loans
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2024
Type of contract
All in One
Prequalification
No
Location
12 District, TP.Hồ Chí Minh

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Audit of construction investment projects in 2024, phase 2 Projects in 2024 include: 1. Development of public low-voltage stations and grids to prevent overload for existing public stations after installing 3-phase galvanometers in District 12 in 2024. 2. Develop an MBA station recovered after TCCS to fully handle the existing public station load in District 12 in 2024. 3. TCCS 8 stations from 250kVA to 400kVA and 5 stations from 400kVA to 560kVA to prevent overload in District 12 in 2024. 4. Construction and installation of switching equipment with SCADA function - 2022. 5. Renovate and build a new connection to the medium voltage line in District 12, 2024". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Audit of construction investment projects in 2024, phase 2 Projects in 2024 include: 1. Development of public low-voltage stations and grids to prevent overload for existing public stations after installing 3-phase galvanometers in District 12 in 2024. 2. Develop an MBA station recovered after TCCS to fully handle the existing public station load in District 12 in 2024. 3. TCCS 8 stations from 250kVA to 400kVA and 5 stations from 400kVA to 560kVA to prevent overload in District 12 in 2024. 4. Construction and installation of switching equipment with SCADA function - 2022. 5. Renovate and build a new connection to the medium voltage line in District 12, 2024" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 3

You did not use the site, Click here to remain logged. Timeout: 60 second