bidding packages for installation of non-stop automatic toll collection system (ETC) under Cau Gie - Ninh Binh expressway construction investment project (phase 1)
bidding packages for installation of non-stop automatic toll collection system (ETC) under Cau Gie - Ninh Binh expressway construction investment project (phase 1)
Appointment of short-term, domestic contractors, no prequalification, no online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2018
Contract Type
All in one
Prequalification
No
Location
2.Package ETC2: Consulting to verify the design of construction drawings and estimate the system of automatic toll collection equipment without stopping
Bidding widely, domestically, without prequalification, without online
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q3 2018
Contract Type
According to fixed unit price
Prequalification
No
Location
Utilities for you:
Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "bidding packages for installation of non-stop automatic toll collection system (ETC) under Cau Gie - Ninh Binh expressway construction investment project (phase 1)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "bidding packages for installation of non-stop automatic toll collection system (ETC) under Cau Gie - Ninh Binh expressway construction investment project (phase 1)" plan as soon as they are posted, sign up for DauThau.info's International VIP 2 plan.